Swimming Pool Construction Technician Course

Or log in to access your purchased courses

The construction-side deep dive: structures, steel, plumbing systems, shotcrete/gunite, and finishes for inground pool builds.

What you’ll learn

  • Read pool construction drawings and engineering specs
  • Understand layout, excavation, and steel (rebar) schedules
  • Follow gunite/shotcrete placement and curing standards
  • Install complete pool plumbing and equipment systems
  • Manage tile, coping, decking, and interior finish sequencing

Lessons

Swimming Pool Construction Technician Course — Lesson 3: Plumbing systems: hydraulics that actually work

Author: Coach Drew

Pool plumbing is a hydraulic system, not just pipe. Learn line sizing against pump flow, suction entrapment code (dual drains, covers), skimmer/return/cleaner-line layout, water-feature and spa plumbing loops, and manifold design at the equipment pad. Covers solvent-weld quality standards and the stub-up, pressure-test, and hold protocol before any concrete flies. Plumbing a Pool That Moves […]

Swimming Pool Construction Technician Course — Lesson 4: Gunite/shotcrete day: placement, shaping, and curing

Author: Coach Drew

The highest-stakes day of the build. Covers crew roles (nozzleman, finishers), rebound management rules, thickness verification, shaping steps/benches/coves to drawing, and float finish standards. Then curing: the watering schedule, why shells crack when it’s skipped, and cold/hot weather adjustments. You’ll learn what the builder checks the morning after and the week after. Gunite Day, Start […]

Swimming Pool Construction Technician Course — Lesson 5: Tile, coping, and decking

Author: Coach Drew

Waterline tile and coping set the visual quality bar for the whole project. Covers bond beam prep and float, tile layout (centering, cuts hidden in corners), thinset/grout selection for submerged service, and coping types (poured, precast, natural stone) with expansion-joint detailing against the deck. Deck section covers sub-base, steel/mesh, drainage slopes, and control-joint layout. Tile, […]

Swimming Pool Construction Technician Course — Lesson 6: Interior finish, startup, and punch-out

Author: Coach Drew

Covers plaster/pebble/quartz finish prep and what the finish crew needs from you, fill protocol (no stopping, hose sock, no swimming the fill), and the startup chemistry sequence set out in the finish manufacturer’s own startup instructions, including the plaster cure window those instructions specify. Ends with punch-list management, final inspection prep, and the documentation package […]